ST CHARLES ROAD over PINE RIVER

SEC 27-34 SUMNER TWP · County 057, Michigan · Built 1925 · 2 Lanes · 610 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000003142
Year Built
1925
Length
27.4 m (89.9 ft)
Max Span
25.9 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
610
Material
Concrete
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$263,000
Total Project Cost
$320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.