MOSINEE GRADE ROAD over BLACK RIVER
SEC 28 ERWIN TWP · County 053, Michigan · Built 1958 · 2 Lanes · 10 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.358856, -90.061042
This bridge is in worse condition than 34.3% of bridges in County 053. The average bridge in Michigan is 0 years old; this one is 68 years old.
Nearby Bridges
KETOLA GRADE ROAD over BLACK RIVER
Built 1994
MOSINEE GRADE ROAD over MCDONALD CREEK
Built 1985
S BLACK RIVER RD over BLACK RIVER
Built 1992
JOHNSON ROAD over BLACK RIVER
Built 2000
VAN BUSKIRK ROAD over MONTREAL RIVER
Built 1975
CTH C over MONTREAL RIVER
Built 1975
ELM LANE over BLACK RIVER
Built 1940
USH 51 over LAYMANS CREEK
Built 1994
OLD COUNTY ROAD over POWDER MILL CREEK
Built 1930
LRD DUPONT RD over MONTREAL RIVER
Built 2003
Bridge Details
- Structure #
- 000000000003005
- Year Built
- 1958
- Reconstructed
- 2003
- Length
- 15.2 m (49.9 ft)
- Max Span
- 11.6 m
- Width
- 6.4 m (21 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $193,000
- Total Project Cost
- $265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.