I-475 over MASSACHUSETTS AVE.

IN FLINT · County 049, Michigan · Built 1978 · 6 Lanes · 56,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002698
Year Built
1978
Length
34.7 m (113.8 ft)
Max Span
15.2 m
Width
37.7 m (123.7 ft)
Lanes
6
Daily Traffic
56,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$106,000
Total Project Cost
$72,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.