I-475 over LEFT TURN LANE NO 3

IN FLINT · County 049, Michigan · Built 1971 · 6 Lanes · 33,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000002690
Year Built
1971
Length
30.2 m (99.1 ft)
Max Span
12 m
Width
37.2 m (122 ft)
Lanes
6
Daily Traffic
33,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.