I-475 over CHAVEZ DR
IN FLINT · County 049, Michigan · Built 1976 · 4 Lanes · 63,400 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
43.031567, -83.677422
This bridge is in worse condition than 86.2% of bridges in County 049. The average bridge in Michigan is 0 years old; this one is 50 years old.
Nearby Bridges
I-475 over GILKEY CREEK
Built 1976
LEWIS NORTH BOUND over GILKEY CREEK
Built 1976
I-475 over DAVISON - BROADWAY AVES
Built 1976
EAST BOULEVARD over GILKEY CREEK
Built 1920
HAMILTON AVENUE over FLINT RIVER
Built 1983
KEARSLEY PARK BLVD over GILKEY CREEK
Built 1920
W BD LONGWAY BLVD over I-475
Built 1976
E BD LONGWAY BLVD over I-475
Built 1976
I-475 over FLINT R W BLVD&R SIDE DR
Built 1976
ROBERT T LONGWAY over GILKEY CREEK
Built 1954
Bridge Details
- Structure #
- 000000000002672
- Year Built
- 1976
- Length
- 51.5 m (169 ft)
- Max Span
- 23.1 m
- Width
- 51.8 m (169.9 ft)
- Lanes
- 4
- Daily Traffic
- 63,400
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $729,000
- Total Project Cost
- $246,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.