M-57 over FLINT RIVER

1.0 MI E OF MONTROSE · County 049, Michigan · Built 1926 · 2 Lanes · 9,126 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002618
Year Built
1926
Reconstructed
1992
Length
107.1 m (351.4 ft)
Max Span
21.3 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
9,126
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.