PASADENA AVE over I-75

3 MI N OF M-21 · County 049, Michigan · Built 1958 · 2 Lanes · 8,421 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

43.046061, -83.754814

This bridge is in worse condition than 58.3% of bridges in County 049. The average bridge in Michigan is 0 years old; this one is 68 years old.

Nearby Bridges

Bridge Details

Structure #
000000000002504
Year Built
1958
Length
60 m (196.9 ft)
Max Span
19.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
8,421
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.