COUNTY HWY 569 over E BR STURGEON RIVER
FOSTER CITY · County 043, Michigan · Built 1945 · 2 Lanes · 453 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
3
Serious
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 3 | Serious |
| Substructure | 5 | Fair |
Location
45.965492, -87.742219
This bridge is in worse condition than 90.5% of bridges in County 043. The average bridge in Michigan is 0 years old; this one is 81 years old.
Nearby Bridges
CHEESE FACTORY RD over E BR STURGEON RIVER
Built 1992
RIDEOUT ROAD over E BR STURGEON RIVER
Built 1945
M-69|CO HWY 569 over E BR STURGEON RIVER
Built 1931
CAMP NO 3 ROAD over E BR STURGEON RIVER
Built 1988
COUNTY HWY 569 over STURGEON RIVER
Built 2024
CAZZOLLA ROAD over STURGEON RIVER
Built 2009
COUNTY HWY 569 over STURGEON RIVER
Built 1923
COUNTY ROAD NO 5 over W BR STURGEON RIVER
Built 2009
COUNTY HWY 581 over E BR STURGEON RIVER
Built 1927
WHITE POST RD over SKUNK CREEK
Built 2024
Bridge Details
- Structure #
- 000000000002202
- Year Built
- 1945
- Length
- 10.6 m (34.8 ft)
- Max Span
- 10 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 453
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $182,000
- Total Project Cost
- $200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.