COUNTY ROAD I 24 over TACOOSH RIVER

1 M N 1 M W RAPID RIVER · County 041, Michigan · Built 1969 · 2 Lanes · 73 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000002168
Year Built
1969
Reconstructed
2020
Length
10 m (32.8 ft)
Max Span
9.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
73
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$45,000
Total Project Cost
$50,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.