COUNTY ROAD H 1 over RAPID RIVER

3 M N 1 M E OF ROCK · County 041, Michigan · Built 1967 · 2 Lanes · 54 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002157
Year Built
1967
Reconstructed
2021
Length
12.7 m (41.7 ft)
Max Span
11.1 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
54
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$30,000
Total Project Cost
$40,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.