NB I-75 BL over I-75 SB

@ S JCT I-75 BL · County 039, Michigan · Built 1961 · 1 Lanes · 4,810 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000002035
Year Built
1961
Reconstructed
2008
Length
61.9 m (203.1 ft)
Max Span
26.8 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
4,810
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.