RIGGSVILLE RD over I-75 NB

8.3 MI N OF M-27 · County 031, Michigan · Built 1960 · 2 Lanes · 900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000001515
Year Built
1960
Length
72.7 m (238.5 ft)
Max Span
22.8 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
900
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.