I-75 NB over D&M RR (ABN)

1.9 MI S OF M-27 · County 031, Michigan · Built 1962 · 2 Lanes · 4,474 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000001505
Year Built
1962
Length
57.2 m (187.7 ft)
Max Span
19 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
4,474
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$130,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.