N ALBION STREET over KALAMAZOO RIVER
6 BLOCKS WEST OF M-99 · County 025, Michigan · Built 2024 · 2 Lanes · 1,631 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
42.247581, -84.762186
This bridge is in worse condition than 5.2% of bridges in County 025. The average bridge in Michigan is 0 years old; this one is 2 years old.
Nearby Bridges
N EATON ST over KALAMAZOO RIVER
Built 2007
N CLINTON STREET over KALAMAZOO RIVER
Built 2010
M-99 (SUPERIOR ST) over S BR KALAMAZOO RIVER
Built 2011
M-99 (SUPERIOR ST) over KALAMAZOO RIVER
Built 1908
EAST CASS STREET over KALAMAZOO RIVER
Built 1996
E ERIE STREET over S BR KALAMAZOO RIVER
Built 2006
E ERIE STREET over E BR KALAMAZOO RIVER
Built 1988
HAVEN ROAD over S BRA KALAMAZOO RIVER
Built 1979
S HANNAH STREET over EAST BRANCH OF KALAMAZOO
Built 1981
S HANNAH STREET over BR OF E BR KALAMAZOO RIV
Built 1981
Bridge Details
- Structure #
- 000000000001396
- Year Built
- 2024
- Length
- 21.3 m (69.9 ft)
- Max Span
- 19.8 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,631
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $295,000
- Total Project Cost
- $345,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.