SOUTH COUNTY LINE over SOAP DRAIN
CLARENDON TWP SEC 36 · County 025, Michigan · Built 1964 · 2 Lanes · 530 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.07245, -84.8343
This bridge is in worse condition than 22.5% of bridges in County 025. The average bridge in Michigan is 0 years old; this one is 62 years old.
Nearby Bridges
ELY ROAD over SOAP CREEK DRAIN #15
Built 2000
SOUTH COUNTY LINE over ST JOSEPH RIVER
Built 1964
HADLEY ROAD over ST JOSEPH RIVER
Built 1965
LITCHFIELD ROAD over SOAP CREEK DRAIN #15
Built 1977
T DR SO over ST JOSEPH RIVER
Built 1962
LITCHFIELD ROAD over SAND CREEK
Built 2015
R DRIVE SOUTH over ST JOSEPH RIVER
Built 1973
SQUIRES ROAD over SOAP CREEK
Built 1960
STERLING ROAD over SOAP CREEK
Built 1965
ST. JOSEPH STREET over NO. BR. ST. JOSEPH RIVER
Built 2002
Bridge Details
- Structure #
- 000000000001293
- Year Built
- 1964
- Length
- 10.6 m (34.8 ft)
- Max Span
- 10.6 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 530
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.