I-94 EB over CSX RR SPUR (ABN)

0.2 MI N OF BRIDGEMAN · County 021, Michigan · Built 1961 · 3 Lanes · 22,675 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000000792
Year Built
1961
Reconstructed
1979
Length
9.4 m (30.8 ft)
Max Span
9.4 m
Width
18.8 m (61.7 ft)
Lanes
3
Daily Traffic
22,675
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$58,000
Total Project Cost
$65,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.