I-94 BL(RED ARROW) over CSX RR
2.2 MI S OF ST JOSEPH · County 021, Michigan · Built 1975 · 3 Lanes · 11,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.085683, -86.498542
This bridge is in worse condition than 62.2% of bridges in County 021. The average bridge in Michigan is 0 years old; this one is 51 years old.
Nearby Bridges
M-63 over HICKORY CREEK
Built 1969
NAPIER AVENUE over ST JOSEPH RIVER
Built 1966
WASHINGTON AVE over HICKORY CREEK
Built 1992
PARK STREET over CSX RAILROAD
Built 1970
CLEVELAND AVE over HICKORY CREEK
Built 1970
I-94 BL (MAIN ST) over MORRISON CHNL INDUS AVE
Built 1976
M-63 over ST JOSEPH RIVER
Built 1949
M-63 over CSX RR & WHITWAM DRIVE
Built 2000
I-94 BL over ST JOSEPH RIVER
Built 1976
WASHINGTON AVE over I-94
Built 1960
Bridge Details
- Structure #
- 000000000000775
- Year Built
- 1975
- Length
- 37.1 m (121.7 ft)
- Max Span
- 13 m
- Width
- 16.9 m (55.4 ft)
- Lanes
- 3
- Daily Traffic
- 11,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $163,000
- Total Project Cost
- $34,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.