I-75 NB over TEBO DRAIN
7.0 MI S OF PINCONNING · County 017, Michigan · Built 1968 · 2 Lanes · 15,522 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
43.797325, -84.021069
This bridge is in worse condition than 25.3% of bridges in County 017. The average bridge in Michigan is 0 years old; this one is 58 years old.
Nearby Bridges
I-75 SB over TEBO DRAIN
Built 1968
SEVEN MILE ROAD over TEBO DRAIN
Built 2020
ERICKSON ROAD over TEBO DRAIN
Built 2020
COGGINS RD over I-75
Built 1968
FRASER ROAD over TEBO CREEK
Built 1976
PREVO RD over I-75
Built 1968
MACKINAW ROAD over JOHNSON DRAIN
Built 2021
M-13 over TEBO DRAIN
Built 1937
KAISER TOWER ROAD over TEBO DRAIN
Built 2021
PREVO ROAD over FRASER-GARFIELD DRAIN
Built 1988
Bridge Details
- Structure #
- 000000000000614
- Year Built
- 1968
- Reconstructed
- 2011
- Length
- 7.3 m (24 ft)
- Max Span
- 6.5 m
- Width
- 15 m (49.2 ft)
- Lanes
- 2
- Daily Traffic
- 15,522
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.