I-75 SB over PINCONNING RIVER

4.0 MI SW OF PINCONNING · County 017, Michigan · Built 2011 · 2 Lanes · 15,522 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000000609
Year Built
2011
Length
19.5 m (64 ft)
Max Span
19.1 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
15,522
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.