M-13 over WHITE FEATHER CREEK

3.0 MI N OF PINCONNING · County 017, Michigan · Built 1938 · 4 Lanes · 8,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000593
Year Built
1938
Reconstructed
1952
Length
8.2 m (26.9 ft)
Max Span
6.8 m
Width
22.2 m (72.8 ft)
Lanes
4
Daily Traffic
8,300
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$21,000
Total Project Cost
$24,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.