M-43 over COLDWATER RIVER

6.2 MI W OF WOODLAND · County 015, Michigan · Built 2024 · 2 Lanes · 2,375 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000000529
Year Built
2024
Length
55.7 m (182.7 ft)
Max Span
50.9 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
2,375
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$101,000
Total Project Cost
$60,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.