PELKIE ROAD over SILVER RIVER
7 MI W OF BARAGA · County 013, Michigan · Built 1950 · 2 Lanes · 853 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
46.795075, -88.636
This bridge is in worse condition than 94.1% of bridges in County 013. The average bridge in Michigan is 0 years old; this one is 76 years old.
Nearby Bridges
KYRO ROAD over STURGEON RIVER
Built 1988
PELKIE ROAD over WEST BRANCH STURGEON RIV
Built 1969
M-38 over STURGEON RIVER
Built 1956
PELKIE ROAD over OTTER RIVER
Built 2005
HOROSCOPE RD L127 over W BR OTTER RIVER
Built 1984
M-38 over SILVER RIVER
Built 2015
FROBERG ROAD over STURGEON RIVER
Built 1978
FROBERG RD over STURGEON SLOUGH DRAIN
Built 2022
HAZEL SWAMP ROAD over W BR OTTER RIVER
Built 1997
FROBERG ROAD over EASTSTURGEONSLOUGH
Built 1985
Bridge Details
- Structure #
- 000000000000511
- Year Built
- 1950
- Length
- 28.9 m (94.8 ft)
- Max Span
- 10.6 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 2
- Daily Traffic
- 853
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $500,000
- Total Project Cost
- $650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.