MELITA ROAD over S BR PINE RIVER
0.2 MI S OF BORDEAU ROAD · County 011, Michigan · Built 2017 · 2 Lanes · 275 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.936711, -84.006472
This bridge is in worse condition than 17.5% of bridges in County 011. The average bridge in Michigan is 0 years old; this one is 9 years old.
Nearby Bridges
I-75 NB|US-23 NB over S BR PINE RIVER
Built 1968
I-75 SB|US-23 SB over S BR PINE RIVER
Built 1968
I-75 NB|US-23 NB over SUNSMITH DRAIN
Built 1968
MELITA ROAD over US-23 NB
Built 1968
I-75 SB TO US-23 N over I-75 NB
Built 1968
US-23 SB over I-75 NB
Built 1968
WORTH ROAD over I-75 NB|US-23 NB
Built 1968
DEEP RIVER over S BRANCH PINE RIVER
Built 1979
WORTH ROAD over SAGANING CREEK
Built 2004
LINCOLN ROAD over SOUTH BR.PINE RIVER
Built 1988
Bridge Details
- Structure #
- 000000000000461
- Year Built
- 2017
- Length
- 28.9 m (94.8 ft)
- Max Span
- 27.6 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 275
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $412,000
- Total Project Cost
- $490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.