KARVONEN ROAD over LAUGHING WHITEFISH RIVER
0.25 MI N OF DEERTON · County 003, Michigan · Built 1910 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
46.4783, -87.044525
This bridge is in worse condition than 52.8% of bridges in County 003. The average bridge in Michigan is 0 years old; this one is 116 years old.
Nearby Bridges
DEERTON ROAD over LAUGHING WHITEFISH RIVER
Built 2006
PETER WHITE ROAD over LAUGHING WHITEFISH RIVER
Built 1947
M-28 over LAUGHING WHITEFISH RIVER
Built 1939
PETER WHITE ROAD over LAUGHING WHITEFISH RIVER
Built 2001
NORTH POINT DRIVE over LAUGHING WHITEFISH RIVER
Built 2006
RISKU FARM ROAD over LAUGHING WHITEFISH RIVER
Built 1958
RISKU ROAD over LAUGHING WHITEFISH RIVER
Built 1999
M-28 over SAND RIVER
Built 1939
SAND LAKE ROAD over SAND RIVER
Built 1915
BAA ROAD over SAND RIVER
Built 1932
Bridge Details
- Structure #
- 000000000000076
- Year Built
- 1910
- Reconstructed
- 2010
- Length
- 9.7 m (31.8 ft)
- Max Span
- 6.7 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $140,000
- Total Project Cost
- $210,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.