KARVONEN ROAD over LAUGHING WHITEFISH RIVER

0.25 MI N OF DEERTON · County 003, Michigan · Built 1910 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
000000000000076
Year Built
1910
Reconstructed
2010
Length
9.7 m (31.8 ft)
Max Span
6.7 m
Width
4.3 m (14.1 ft)
Lanes
2
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$140,000
Total Project Cost
$210,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.