CRUZEN ROAD over SO BRANCH OF PINE RIVER

2.0 MI W 1.2 MI S MIKADO · County 001, Michigan · Built 1984 · 2 Lanes · 339 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000029
Year Built
1984
Length
17.6 m (57.7 ft)
Max Span
15.8 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
339
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.