US 6 EB/MD CP HWY over HWY UNION ST

2.3 M E OF WILLOW ST · County 001, Massachusetts · Built 1970 · 3 Lanes · 38,017 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
Y0101247BDOTNBI
Year Built
1970
Length
21.6 m (70.9 ft)
Max Span
19.8 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
38,017
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,043,000
Total Project Cost
$3,065,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.