HWY SOUTHBRDG ST over WATER MIDDLE RIVER

UNDER I-290 AT HOLY CROSS · County 027, Massachusetts · Built 1956 · 2 Lanes · 12,180 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
W440121E2MUNNBI
Year Built
1956
Reconstructed
1993
Length
40.3 m (132.2 ft)
Max Span
19.2 m
Width
19.8 m (65 ft)
Lanes
2
Daily Traffic
12,180
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,271,000
Total Project Cost
$7,907,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.