US 7 NEW ASHFORD over WATER W BR GREEN RIVER

AT INT. OF ROUTES 7 & 43 · County 003, Massachusetts · Built 1957 · 2 Lanes · 4,849 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W370180A8DOTNBI
Year Built
1957
Reconstructed
2007
Length
18.9 m (62 ft)
Max Span
17.8 m
Width
16.1 m (52.8 ft)
Lanes
2
Daily Traffic
4,849
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,986,000
Total Project Cost
$2,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.