HWY WEST RD over I 90

MM 37.4 ON I-90 · County 013, Massachusetts · Built 1957 · 2 Lanes · 600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
W250444K0DOTNBI
Year Built
1957
Reconstructed
1995
Length
77.8 m (255.2 ft)
Max Span
15.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,955,000
Total Project Cost
$8,933,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.