US202 ST10/ELM SB over WATER WESTFIELD RIVER

JCT MEADOW ST. · County 013, Massachusetts · Built 1938 · 3 Lanes · 27,300 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W250100V8DOTNBI
Year Built
1938
Reconstructed
2011
Length
114.6 m (376 ft)
Max Span
56.1 m
Width
13.2 m (43.3 ft)
Lanes
3
Daily Traffic
27,300
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,110,000
Total Project Cost
$16,666,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.