ST140 BEAMAN ST over WATER STILLWATER RIVER

.2 MI E OF THOMAS ST. · County 027, Massachusetts · Built 1904 · 2 Lanes · 7,334 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W170034CWDOTNBI
Year Built
1904
Length
10.7 m (35.1 ft)
Max Span
10.7 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
7,334
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$909,000
Total Project Cost
$1,364,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.