HWY MAIN AVE over WATER EAST RIVER
.7 MI SW OF RTE 6 · County 023, Massachusetts · Built 2005 · 2 Lanes · 8,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.747867, -70.656122
This bridge is in worse condition than 10.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 21 years old.
Nearby Bridges
HWY ONSET AVE over WATER EAST RIVER
Built 1914
HWY GLEN CHRL RD over ST 25
Built 1980
US 6 EB/ST28 SB over WATER AGAWAM RIVER
Built 1949
HWY ONSET AVE over RR MACRR
Built 1990
ST 25 EB over WATER MILL POND
Built 1981
ST 25 WB over WATER MILL POND
Built 1987
US 6 /ST28/CRNBRY over WATER COHASSET NARROWS
Built 2014
HWY MAPLE SPRING over ST 25
Built 1980
US 6 SANDWICH RD over WATER AGAWAM RIVER
Built 1930
HWY SHORE RD over WATER BACK RIVER
Built 1931
Bridge Details
- Structure #
- W06017AW9MUNNBI
- Year Built
- 2005
- Length
- 34.4 m (112.9 ft)
- Max Span
- 33.3 m
- Width
- 16.6 m (54.5 ft)
- Lanes
- 2
- Daily Traffic
- 8,600
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $655,000
- Total Project Cost
- $983,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.