US 3 NB over HWY DUNSTABLE RD

1.5 MI. N OF RTE 40 · County 017, Massachusetts · Built 2004 · 3 Lanes · 82,679 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
T090118HHDOTNBI
Year Built
2004
Length
45 m (147.6 ft)
Max Span
43.7 m
Width
23 m (75.5 ft)
Lanes
3
Daily Traffic
82,679
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$687,000
Total Project Cost
$1,031,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.