HWY WHEELER RD over WATER WILLARD BROOK

AT CORNER OF RT.119 · County 017, Massachusetts · Built 2011 · 2 Lanes · 2,597 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
T07008B15MUNNBI
Year Built
2011
Length
12.2 m (40 ft)
Max Span
11 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
2,597
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$892,000
Total Project Cost
$1,339,000