HWY NORTH ST over I 495
0.6 MI SWLY RT 133 · County 017, Massachusetts · Built 1961 · 2 Lanes · 6,200 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
42.638647, -71.240208
This bridge is in worse condition than 89.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 65 years old.
Nearby Bridges
I 495 SB over ST133 ANDOVER ST
Built 1961
I 495 NB over ST133 ANDOVER ST
Built 1961
HWY TRULL RD over I 495
Built 1962
I 495 SB over HWY HAGGETTS POND RD
Built 1961
I 495 NB over HWY HAGGETTS POND RD
Built 1961
ST 38 MAIN ST over RR BMRR
Built 1938
I 495 NB over ST 38 MAIN ST
Built 1961
I 495 SB over ST 38 MAIN ST
Built 1961
I 495 NB over RR PAN AM
Built 1961
I 495 SB over RR PAN AM
Built 1961
Bridge Details
- Structure #
- T030132L5DOTNBI
- Year Built
- 1961
- Length
- 84.7 m (277.9 ft)
- Max Span
- 22.1 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 6,200
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $13,075,000
- Total Project Cost
- $19,613,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.