ST 57 FDNG HILS RD over WATER GREAT BROOK

1.6 M E JCT US 202 · County 013, Massachusetts · Built 1956 · 2 Lanes · 1,552 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S2200611VDOTNBI
Year Built
1956
Length
8.7 m (28.5 ft)
Max Span
8.4 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
1,552
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$85,000
Total Project Cost
$128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.