HWY EAST ST over WATER MANHAN RIVER

AT INT WITH STRONG RD · County 015, Massachusetts · Built 2022 · 2 Lanes · 6,724 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
S19010C7EMUNNBI
Year Built
2022
Length
30.2 m (99.1 ft)
Max Span
28.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
6,724
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.