ST116 MAIN RD over WATER WESTFIELD RIVER

.4 MI SE OF JCT W/ROUTE8A · County 003, Massachusetts · Built 1961 · 2 Lanes · 3,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S0602202DMUNNBI
Year Built
1961
Length
12.2 m (40 ft)
Max Span
11.8 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
3,750
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$588,000
Total Project Cost
$883,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.