ST 68 S ROYLSTN RD over WATER LAWRENCE BROOK
300 N WINCHENDON RD · County 027, Massachusetts · Built 1940 · 2 Lanes · 715 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.671175, -72.173172
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 86 years old.
Nearby Bridges
HWY TOWN DUMP RD over WATER LAWRENCE BROOK
Built 2019
HWY NE FITZWM RD over WATER LAWRENCE BROOK
Built 2014
HWY ATHOL RD over WATER LAWRENCE BROOK
Built 1930
DOANE HILL ROAD over TULLY RIVER
Built 1944
ST 68 WARWICK RD over WATER E BR TULLY RIVER
Built 1948
HWY N FITZWLM RD over WATER LAWRENCE BROOK
Built 2017
HWY WINCHNDON RD over WATER PRIEST BROOK
Built 1937
HWY N FITZWLM RD over WATER LAWRENCE BROOK
Built 2019
ST 68 BLDWNVLLE RD over WATER MILLERS RIVER
Built 2002
MA ROUTE 32 over SPILLWAY CHANNEL
Built 1948
Bridge Details
- Structure #
- R12002164MUNNBI
- Year Built
- 1940
- Length
- 14.1 m (46.3 ft)
- Max Span
- 13.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 715
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $828,000
- Total Project Cost
- $1,243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.