HWY PARK AVE over US 1 NE XWAY

01.2 KM N OF JCT SR16 · County 025, Massachusetts · Built 1957 · 2 Lanes · 4,050 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
R050293ERDOTNBI
Year Built
1957
Reconstructed
1992
Length
42.9 m (140.7 ft)
Max Span
20.7 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
4,050
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,244,000
Total Project Cost
$6,367,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.