I 195 EB over WATER PALMER RIVER

.6 MI FROM SWANSEA T.L. · County 005, Massachusetts · Built 1960 · 3 Lanes · 44,535 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
R040183U4DOTNBI
Year Built
1960
Length
47.5 m (155.8 ft)
Max Span
20.1 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
44,535
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,423,000
Total Project Cost
$8,135,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.