I 395 NB over HWY MILLBURY RD

MM 8.5 / .5 MI S DEPOT RD · County 027, Massachusetts · Built 1976 · 2 Lanes · 25,262 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
O060381Q7DOTNBI
Year Built
1976
Length
34.1 m (111.9 ft)
Max Span
30.5 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
25,262
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,113,000
Total Project Cost
$4,670,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.