I 90 EB over ST 56 LEICESTER ST

NEAR TEXAS POND J8 · County 027, Massachusetts · Built 1957 · 3 Lanes · 45,702 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
O060284M6DOTNBI
Year Built
1957
Reconstructed
1986
Length
47.4 m (155.5 ft)
Max Span
17.6 m
Width
17.3 m (56.8 ft)
Lanes
3
Daily Traffic
45,702
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,391,000
Total Project Cost
$8,087,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.