ST 10 SOUTH ST over WATER MILL RIVER

1.2 M S JCT ST 9 · County 015, Massachusetts · Built 1939 · 2 Lanes · 21,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N190530V1DOTNBI
Year Built
1939
Length
32.1 m (105.3 ft)
Max Span
15.3 m
Width
17.3 m (56.8 ft)
Lanes
2
Daily Traffic
21,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,707,000
Total Project Cost
$5,561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.