HWY ALLEN AVE over I 295
BEHIND EMERALD SQ MALL · County 005, Massachusetts · Built 1966 · 2 Lanes · 3,879 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.949558, -71.353975
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 60 years old.
Nearby Bridges
I 295 NB over US 1 S WASHINGTON ST
Built 1966
I 295 SB over US 1 S WASHINGTON ST
Built 1966
I 295 over WATER SEVEN MILE RIVER
Built 1966
I 295 NB over HWY PAINE RD
Built 1966
I 295 NB over HWY OLD POST RD
Built 1967
I 295 SB over HWY OLD POST RD
Built 1967
I 295 SB over HWY PAINE RD
Built 1966
HWY HUNTS BRG RD over WATER ABBOTT RUN RIVER
Built 2007
HWY CUSHMAN RD over WATER ABBOTT RUN RIVER
Built 1886
I 295 NB over HWY MT HOPE ST
Built 1967
Bridge Details
- Structure #
- N160523Y5DOTNBI
- Year Built
- 1966
- Length
- 88.4 m (290 ft)
- Max Span
- 22.3 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 3,879
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,338,000
- Total Project Cost
- $11,008,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.