ST113 STOREY AVE over WATER ARTICHOKE RIVER

1 MI W I95 · County 009, Massachusetts · Built 1972 · 2 Lanes · 9,310 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N1100830VDOTNBI
Year Built
1972
Length
25.3 m (83 ft)
Max Span
6.1 m
Width
17.4 m (57.1 ft)
Lanes
2
Daily Traffic
9,310
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,937,000
Total Project Cost
$4,406,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.