HWY RAYCROFT RD over WATER DUNBAR BROOK

300 FROM INT. W/ MAIN RD · County 011, Massachusetts · Built 2019 · 1 Lanes · 129 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
M26004C3MDOTNBI
Year Built
2019
Length
14.1 m (46.3 ft)
Max Span
13.4 m
Width
3.6 m (11.8 ft)
Lanes
1
Daily Traffic
129
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.