ST115 PLAIN ST over RR BCRR

.1 MI. NE OF ST-109. · County 021, Massachusetts · Built 2003 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M23008AVLDOT634
Year Built
2003
Length
30 m (98.4 ft)
Max Span
13.1 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
5,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,029,000
Total Project Cost
$3,044,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.