ST110 CHURCH over WATER CONCORD RIVER

0.25 MI W RT 38 · County 017, Massachusetts · Built 1858 · 2 Lanes · 13,000 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
L150252LYDOTNBI
Year Built
1858
Reconstructed
1961
Length
31.1 m (102 ft)
Max Span
14 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
13,000
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,992,000
Total Project Cost
$4,489,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.