HWY PLAIN ST over RR CSX (ABAND)

0.25 SE LWLL CONN · County 017, Massachusetts · Built 1993 · 2 Lanes · 9,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
L150022N4DOT634
Year Built
1993
Length
22.9 m (75.1 ft)
Max Span
10.7 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
9,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$861,000
Total Project Cost
$1,292,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.